ABSTRACT The Widening Project to Add Lanes to the Siak IV Pekanbaru Access Road is one of the road construction projects that experienced a delay of 27.791% of the planned schedule. The delay requires risk identification and assessment as an initial form of risk management. This study aims to identify the causative factors of the risk of delays during the construction period by using one o…