ABSRACT Before constructing a building, a Preliminary Design calculation is carried out for the rough loading received by the building to find out the dimensions of the mosque building structure requirements and the Budget Plan, which is one of the processes carried out to determine the total amount of work costs by outlining each work item starting to calculate the volume work, calculating th…