Perencanaan Dan Perhitungan Rencana Anggaran Biaya Sd-It Al-Muttaqin Jalan Patin, Kecamatan Marpoyan Damai, Kota Pekanbaru
ABSTRACT
Before constructing a building, a Preliminary Design calculation is carried out for the rough loading received by the building to find out the dimensions of the SDIT building structure requirements and the Budget Plan, which is one of the processes carried out to determine the total amount of work costs by outlining each work item starting to calculate the volume work, calculating the Work Unit Price Analysis (AHSP), calculating the details of the Cost Budget Plan, all of which refer to the plan drawings, prices for materials and wages around the mosque location and AHSP Permen PUPR. After obtaining volume calculations and details of the RAB and planning the Work Plan and Requirements.
As for the purpose of this project, the authors designed a plan drawing with a building area of 553,2 m2, made a work plan and technical requirements and calculated a budget plan. The results obtained are the total building costs of IDR 2,427,883,000.00 (Two Billion Four Hundred Twenty Seven Million Eight Hundred Eighty Three Thousand Rupiah), and the cost per m2 of the building is IDR Rp4,388,798 (Four Million Three Hundred Eighty Eight Thousand Seven Hundred Ninety Eight Silver Rupiah).
Keywords: Preliminary Design, Budget Plan (RAB), Work Plan Terms,AutoCAD
Tidak tersedia versi lain