CD Skripsi
Evaluasi Dan Proyeksi Runway Serta Apron Pada Bandar Udara (Studi Kasus : Bandar Udara Internasional Sultan Mahmud Badaruddin Ii Palembang)
ABSTRACT
Sultan Mahmud Badaruddin II International Airport experiences an increase in the number of passengers and aircraft movements every year, requiring an evaluation to be carried out at least once in 5 years. Therefore, it is necessary to analyze the air side facilities, in this study the air side that is examined is the runway and apron. The purpose of this study is to determine the dimensions of the runway and apron that can serve in 2025 and 2030, as well as compare the existing and planned conditions. This study uses the B777-300 as the planned aircraft. The forecast used to project aircraft movements for the plan year is polynomial regression. The research results show that the dimensions of length for the B777-300 aircraft is 4147 m, runway dimensions must be developed. The area and capacity of the apron need in 2025 is 20 parking stands with an apron area of 1438 m x 187 m and for 2030 need 20 parking stands with an apron area of 1651 m x 187 m. The results of the analysis for 2025 and 2030 show that the apron capacity has exceeded the existing capacity and optimization is needed, because the current apron capacity is 8 parking stands with an area of 410 x 133.5 m.
Keywords : Airports , Apron, Runway, Forcast, Regresion, Optimization
Tidak tersedia versi lain