CD Skripsi
Produktivitas Tenaga Kerja Pada Kelompok Pengolah Ikan Patin Salai Di Sentra Pengolahan Kampung Patin, Desa Koto Mesjid, Kabupaten Kampar
This research was conducted at the Kampar Patin Village Processing Centre in February 2024. The determination of the research location was purposive based on the consideration that Kampung Patin Processing Centre is a potential patin fish processing production area. This sampling method uses a survey method, namely by conducting field observations and direct interviews. It is known that the number of salted catfish processing workers in the Processing Centre is 36 people. The purpose of this study is to determine the level of labour productivity and analyse the factors that affect labour productivity. The method used to analyse the data in this study is using single factor productivity analysis and multiple linear regression analysis. The results showed that the average productivity of catching fish was 0.98 tonnes/hour, cleaning fish was 1.13 tonnes/hour, and lighting fish was 0.49 tonnes/hour. From the regression results, it can be concluded that the coefficient of determination (R²) value of 0.806 indicates that labour productivity is influenced by variables contained in the model by 80.6%, while the remaining 19.4% is explained by other variables not included in the model. Factors that have a real effect on labour productivity of salted catfish production are wages, education, experience and number of dependents. In this study, the variable that has the most influence on labour productivity is the experience variable.
Keywords: Productivity, Labor, Factors
Tidak tersedia versi lain