CD Tugas Akhir
Evaluasi Kerusakan Permukaan Jalan Menggunakan Metode Bina Marga (Studi Kasus Jalan Cipta Karya Kota Pekanbaru)
ABSTRACT
Jalan Cipta Karya is 3.3 km long and 5 m wide connecting Jalan Bersama and Jalan HR. Soebrantas. This type of Cipta Karya road is a two-lane, two-way, undivided road. The types of damage that occur include cracks and holes which interfere with driving comfort and can result in accidents, which are reviewed based on the results of observations in the field. The aim of this research is to determine the type of damage on the Jalan Cipta Karya Pekanbaru City section and obtain the condition/value of the pavement index on the Jalan Cipta Karya Pekanbaru City section using the Bina Marga method. From the results of research on damage to Jalan Cipta Karya Pekanbaru City STA 00+000 ‒ 02+500, the results of identifying the types of damage to Jalan Cipta Karya are patches (2.203%), holes (0.52%), crocodile skin cracks (1.013%), longitudinal cracks (0.353%). %), Transverse cracks (0.0005%), Surface roughness (0.111%), Grooves (0%), and Subsidence (0%), so the total damage which occurred on this road section was 4.2%. From the calculation results it was obtained that the Priority Order (UP) value for the Cipta Karya Pekanbaru City road pavement with an average value of the Bina Marga method was 6.44 which was included in the routine maintenance program.
Keywords: Bina Marga (BM), Damage to Jalan Cipta Karya Pekanbaru City
Tidak tersedia versi lain