Digilib Perpustakaan Universitas Riau

Tugas Akhir, Skripsi, Tesis dan Disertasi Mahasiswa Universitas Riau

  • Beranda
  • Informasi
  • Berita
  • Bantuan
  • Pustakawan
  • Pilih Bahasa :
    Bahasa Arab Bahasa Bengal Bahasa Brazil Portugis Bahasa Inggris Bahasa Spanyol Bahasa Jerman Bahasa Indonesia Bahasa Jepang Bahasa Melayu Bahasa Persia Bahasa Rusia Bahasa Thailand Bahasa Turki Bahasa Urdu

Pencarian berdasarkan :

SEMUA Pengarang Subjek ISBN/ISSN Pencarian Spesifik

Pencarian terakhir:

{{tmpObj[k].text}}
No image available for this title
Penanda Bagikan

Majalah

System dynamics modelling of deforestation rate and forest rehabilitation in the upstream of Ciliwung watershed, Bogor regency

Andi Setyo Pambudi - Nama Orang;

Abstract
One of strategic watersheds in Indonesia is the Ciliwung watershed. The rapid growth of development in this watershed has resulted in reduced forested lands and water catchment areas. The critical point is when the upstream area as a buffer zone also experiences uncontrolled land conversion for various purposes. Indonesia Law Number 41 of 1999 concerning Forestry, Article 18 contains a mandate for the Government to determine and to maintain the adequacy of forest cover in each watershed. This research seeks to understand the condition of rehabilitation and deforestation of forested land in Bogor Regency as the upstream of the Ciliwung watershed which affects its downstream water system in DKI Jakarta Province. By applying system dynamics modelling, it is expected that an ideal scenario of rehabilitation which the government must undertake will be identified to cope with deforestation rates in forested upstream watersheds. The methodological approach applied in this paper is a mixed method with system dynamics - based analysis methods. The results of model simulations carried out in Business as Usual conditions and Simulation of Scenarios Model going forward to 2060. From the alternative scenarios available, it reveals that the rehabilitation capability scenario of 3.6% / year is the most optimal in order to overtake deforestation rates in the upstream Ciliwung watershed. If the simulation setting is extended to 2100, the maximum area of ​​forested land in 2090 will be 8,134.05 ha (still below the carrying capacity of the available forest area).

Keywords
Watershed, Deforestation, Rehabilitation, System Dynamics


Ketersediaan

Tidak ada salinan data

Informasi Detail
Judul Seri
Jurnal Perencanaan Pembangunan The Indonesian Journal of Development Planning, Vol. IV, No. 3 September 2020
No. Panggil
-
Penerbit
Jakarta : Kementerian PPN / Bappenas., 2020
Deskripsi Fisik
8 hlm.; 26 cm
Bahasa
English
ISBN/ISSN
2598-0807
Klasifikasi
NONE
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
Vol. IV, No. 3 September 2020
Subjek
PERENCANAAN PEMBANGUNAN
Info Detail Spesifik
Alamat Website https://doi.org/10.36574/jpp
Pernyataan Tanggungjawab
Andi Setyo Pambudi
Versi lain/terkait

Tidak tersedia versi lain

Lampiran Berkas
Tidak Ada Data
Komentar

Anda harus masuk sebelum memberikan komentar

Digilib Perpustakaan Universitas Riau
  • Informasi
  • Layanan
  • Pustakawan
  • Area Anggota

Tentang Kami

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

Donasi untuk SLiMS Kontribusi untuk SLiMS?

© 2025 — Senayan Developer Community

Ditenagai oleh SLiMS
Pilih subjek yang menarik bagi Anda
  • Karya Umum
  • Filsafat
  • Agama
  • Ilmu-ilmu Sosial
  • Bahasa
  • Ilmu-ilmu Murni
  • Ilmu-ilmu Terapan
  • Kesenian, Hiburan, dan Olahraga
  • Kesusastraan
  • Geografi dan Sejarah
Icons made by Freepik from www.flaticon.com
Pencarian Spesifik
Kemana ingin Anda bagikan?