ABSTACT School safety zone (ZoSS) is the speed limit controller through installation of markings and signs on the street in the school which is to prevent accidents in order to ensure the safety of the school student. School safety zone (ZoSS) has been in Indonesia since 2006. However, there is no evaluation of whether ZoSS is effective enough to improve school safety. The objective of thi…
ABSTRACT The boundary section of Kuansing Regency - Muara Lembu is one of the national roads. The road has exceeded its planned lifespan and there has not been any rehandling. Therefore, the road requires evaluation by analyzing the remaining life that is still available to serve the traffic load after the planned life has expired. This research aims to predict the remaining service life b…
ABSTRACT In an effort to manage water quality, the construction of water structures must be appropriate in order to maintain water quality and quantity. In the planning of water structures begins with hydrological analysis. To obtain accurate hydrological data, it is necessary to have a sufficient number of rain gauge station that are evenly distributed so that they can represent the hydrologi…
ABSTRACT One of the basics of building planning is drawing planning and the calculation of the Budget Plan (RAB). Plan drawings are needed to calculate RAB and also as a guide when carrying out work in the field. This RAB aims to be able to find out the details of the costs incurred by the building owner when constructing the desired building. The RAB calculation requires a reference in the fo…
ABSTRACT According to Mahardika (in M.Kautsar Nur Rochman, 2017) Road Transport Traffic Safety Facilities (KLLAJ) are all parts of the road and there are several criteria as considerations to optimize the safety of road users including traffic signs, road markings, traffic signaling devices. traffic, street lighting devices, controllers and road user safety devices. The purpose of installing r…
ABSTRACT Construction implementation can run smoothly and be completed on time, if construction management is carried out properly. Construction management can manage when the construction is carried out and when it is completed with the specified time calculation. This is done so that the construction can be carried out effectively, efficiently, and can be accounted for. One of the problems t…
ABSTRACT Maxim a company engaged online taxy that has invaded Pekanbaru in 2019. The development of Maxim as online transportation service in Pekanbaru is fairly rapid and accommodates lot of workers and is used as the main and side source of income by some drivers. The investment spent in the field of online transportation requires considerable costs, so it is necessary conduct research studi…
ABSTRACT The Kaiti Samo Irrigation Area is located in Kaiti Village to Batang Samo Village in Rokan Hulu Regency Riau Province's. Kaiti Samo irrigation consists of several connections between weirs, including the Kaiti weir, the Pegadis weir, and the Samo weir. The three weirs are watersheds that are close to each other but are not one stream. If the irrigation water supply cannot be separated…
ABSTRACT In the progress of a region, it can be seen from economic growth that makes economic growth able to provide progress for the area, one of the factors of economic growth, namely from business activities both small and large. A business that has the potential to advance the economy is a business in the culinary field, where businesses in the culinary field are businesses that are often …
ABSTRACT Taman Karya Pekanbaru city’s road is a local secunder road connecting between the activity centers of Pekanbaru City . Where it has a road length of ± 1.5 kilometers, a lane width of 6 meters. The purpose of this study is to determine the types of damage and find out the index value of the bending pavement condition on Taman Karya Pekanbaru city’s road using the Pavement Conditio…
ABSTRACT Street Durian is an undivided 2-lane 2-way collector road (2/2 UD) located in the Pekanbaru area. This road is traversed by many types of vehicles, both light vehicles, medium vehicles, so that during rush hours traffic jams or delays are common. The method for calculating this unsignalized intersection is guided by MKJI 1997. Based on the research results it can be seen that the peak…
ABSTRACT Merbau wood is a type of wood that is easily recognized for its fiber texture and is widely used for paneling, flooring, windows and doors. This wood has very low shrinkage, so it is not easily deformed when dried. In this study, the wood waste used was sawdust of merbau wood which was used as a partial replacement for sand in the manufacture of mortar with the aim of knowing the effe…
ABSTRACK One of the weaknesses of the concrete material is that it is easily damaged in aggressive or extreme environments, concluding in seawater. Wet dry cycle mechanism can be used as a simulation of concrete exposed to be attacked by sea water. Shellfish waste that goes through a burning process at 700°C will produce a CaO content of 55.10%, so it has the potential to be a substitute for …
ABSTRACT Initial damage to the structure occurs in the outer layers of the affected surface exposure to the peat environment and the static and dynamic movement of the structure. To prevent structural damage, the latest technological innovations are needed in the use of mortar constituent materials to increase the strength of the mortar. Polymer mortar is a composite material formed from a mix…
ABSTRACT Beams are a rigid part of the structure of a building. This beamis specifically designed to be able to withstand and transfer loads to column. Beams without shear reinforcement will experience changes in behavior both in terms of strength and failure patterns. The purposes of this study were to analyze the behavior of reinforced concrete beams reinforced with the Deep Embedment me…
ABSTRACT Development project activity is an activity whose start and finish schedule has been determined, with the allocation of certain resources and intended to produce a product. If there is a delay in the schedule, it will affect the objectives of the project. There was a delay in the Makorem Main Building Development Project between the planned schedule and the actual implementation. The …
ABSTRACT This research aims to develop the durability of acrylic polymer concrete. In this study, the durability of concrete investigated is concrete strength, concrete impermeability and corrosion of concrete reinforcement. The strength of concrete is shown by testing the compressive strength of concrete and the tensile strength of concrete. The experimental results showed an increase in conc…
ABSTRACT High population growth in Pekanbaru City has increased the need for housing so that it can directly reduce water catchment areas. For this reason, groundwater conservation is needed as an effort to maintain the existence and sustainability of the condition, nature and function of groundwater in Pekanbaru City. The Pekanbaru City Government emphasized in Pekanbaru City Regional Regulat…
ABSTACK The increase in population in Pekanbaru City causes an increase in the number of movements using vehicles. Traffic flow problems that often occur cause traffic jams, air pollution, sound or noise and accidents. The problem of accidents needs to be researched with the aim of knowing the characteristics of accidents that occurred on Jalan Kaharuddin Nasution Pekanbaru based on accident r…
ABSTRACT The purpose of writing this final project Planning and Budget Plan (RAB) is to plan the building and calculate the Budget Plan for constructing a building. Data collection was carried out by conducting a literature study on manuals and documents related to building planning. In addition, data collection was also carried out directly in the field to collect data on the condition of lan…