Time schedule can be define as distribution of time for each part of work during a project, start from the begin of work until the end of it. The goals of this research are to analyze the time schedule using network planning with CPM method; to calculate the incremental cost due to acceleration, total cost according to number of labour on critical path; and also to compare the calculation b…
The high value of side barriers on a road segment will cause a decrease in road performance. The amount of side barriers is very influential on the capacity of road and vehicle speed. The purpose of this study is to analyze the factors that influence side barriers as well as service levels to improve traffic performance. The research conducted in the form of traffic volume survey (LHR) to see v…
Decreasing of water debit for agricultural irrigation service is the basic problem in Batang Samo Weir in Rokan Hulu Regency that caused by direct water use for fish ponds at some place around 30,05% along main irrigation channel. To reduce water losses in the primary canal, water flow analysis needed in order to create a new intake channel for the development of fishery area downstream of Bata…
Side friction is road side activity that can lead to conflict and affect the movement of the traffic flow and reduce the function of road performance. The ammount of side friction affects capacity and speed of road vehicles. This research are obtained by doing survey of traffic volume to see the density of vehicles, then surveys the side friction to see the influence of interference and instant…
Roads damage can use inconvenience for road user. Roads are damage should be repaired or increased. Overlay calculations using data deflection on the way through the Garuda Sakti Pekanbaru City conducted to complete the road infrastructure. The purpose of this study was to calculate the extra thick layer (overlay), the design life 5 years and 10 years, traffic growth 7,04 %, while the length of…
Roads are the most important transportation infrastructure that use to support the local economy. Budi Kemuliaan are classified as local road with 2 lane and 2 way road undivided with total length are 5 km and width are 6 m. This final assignment aims to plan Rigid Pavement Thickness on Budi Kemuliaan Street. Data required in design is the value of CBR and average daily traffic in roads being r…
Tuanku Tambusai of the street is the primary collector road 4 lane 2 divided direction. This road is traversed by various types of vehicles, from light vehicles, heavy vehicles and motorcycles. Population density with the growth of urban road infrastructure in Pekanbaru is not balanced, causing traffic congestion during rush hour. This final project aims to calculate road performance on Tuanku …
The study of the effect of the use of shellfish waste as a substitute of some fine and coarse aggregate is due to shell waste is one type of artificial light aggregate, other than that the shell is a local material that is easy in the can and shell waste has not been widely utilized. The purpose of this research is to know the comparison of the results of the compressive strength of normal conc…
The outdated construction has reached the expected final surface index that needs to be added layer to be able to regain strength and comfort. The calculation of overlay by using data deflection on the road Garuda Sakti Pekanbaru Riau Province conducted to complement and road infrastructure. The purpose of this study was to calculate the thickness of the overlay layer, the age of the plan 5 yea…
Flexible Pavement is a pavement construction that has multiple layers. Each pavement layer in general uses different materials and requirements according to its function, with a road length of 1.3 Km with a width of 5 m, as an alternative way to Jalan Dharma Bakti, at this time Jalan Fajar Ujung Labuh Baru Barat at STA 0+ 000 to 1 + 300 is still a basic land, thus inhibiting the function of ser…
In the field of civil engineering, heavy equipment used to assist humans in performing the construction work of a building structure. Currently heavy equipment is an important factor in the project, especially construction projects with large scale. Even heavy equipment is a crucial factor in the successful completion of work on time in accordance with a predetermined quality. In this study, fo…
Heavy epuipment plays an important role because it can facilitate and assist employees in completing the project, especially for projects in a large scale. Heavy equipment which is used in a project must be considered because it affects the time and cost of the project. This research aims to Analysis of Equipment Usage in Base Layer Class B Aggregate Works at Swakarya Road Districts of Tampan P…
Budi Kemuliaan road segment has a length of 1.1 Km and width of 6 m with collector type two lane bidirectional way is not divided. This road can be used as a road access to the city center. Over time, this road was damaged. This is due to the increased volume of vehicles that make the road a crack in the pavement layer. The purpose of this study was to determine the thickness of the flexible pa…
The carrying capacity of the pile can be obtained from the data sondir, SPT data and calendering data. Data sondir and SPT data obtained from the development plan office regent of Tembilahan. This study will analyze the highest and lowest Qu of the comparison of the data to the 3 data from the data Sondir S01 (Meyerhoff method, LCPC method Dr.Peter Robertson) data SPT BR-01 (Meyerhoff method, …
Jalan Fajar Ujung is a collector road connecting centers of activities such as education, offices, health, commerce and housing. This road is classified as a collector road with two undivided two-lane paths (2/2TB). Viewing visually path Fajar Ujung there are road damage such as granular releases, patches, perforations and cracks that hamper the function of the service as a viable means of tran…
The economically square shaped cross-sectional is if the water depth (h) is a half to the width of the channel floor (B). Based on the cross-sectional condition of the drainage at UIN Suska Riau, the visible dimension is not economical with the floor width of channel (B) is equal to the channel height (H). To find out the dimension of the channel plan with an economical square cross-sectional a…
Air Hitamis a street that is in the city of Pekanbaru. This road classified arterial road as a two – line with two-way (2/2 UD) and a four - line with two-way(4/2 D). Visual see Air Hitam street so dense and there are many road damage such as cracket surfaces, corrugated, perforated, delamination, andloose aggregate thus inhibiting the fungtion of the service as a means of transport the be us…
Geometric Design of way is route design from certain a way as according to complete, include several element who suited with completeness data and having data base or available data from survey result at location and already for analysis along with refer to be valid standard. Processing data did using calculation be obtained. There is for Alinement Horizontal that a bend in the road mulberry da…
Coconut Shell Coal is one of material who commonly be found, but the widespread use is only limited as disposable fuel, then the purpose of this research is to find out the influence of coconout shell coal to compressive strength of concrete. The specimen which used in this research is cube with size side 15cm. The percentage of coconut shell coal as partial subtitute of sand used in this resea…
Roads are the most important ground transportation infrastructure that use to support the local economy. Labuhan Tangga Besar – Labuhan Tangga Kecil are classified as local road with type 2 lane road undivided 2 way roads with total leght are 5 km and width are 6 m. This finl assignment aims to plan rigid pavement thickness and use of subbase on Labuhan Tangga Besar – Labuhan Tangga Kecil. …