Analisis Biaya Pemakaian Alat Berat Pada Proyek Rekontruksi Jalan Batas Kota Pariaman – Manggopoh Kabupaten Padang Pariaman Provinsi Sumatera Barat
The selection of heavy equipments are vital to the sustainability of a project. The choice of heavy equipments is appropriate so that the project work goes according to plan. Culpability in the choice of heavy equipments will result in ineffective and efficient project management. This research is aimed to analyze and identify the cost of heavy equipments usage on the reconstruction Pariaman-Manggopoh border area Padang Pariaman Regency West Sumatera Province and to give the alternative manufacture and the effective enforcement method in the use of heavy equipments. The calculation is analyzed by Bina Marga method. As on the result, it is found that construct the Aggregate Foundation Layer class A needs cost Rp. 1.587.698.428,60 and construct the Asphalt Pavement Layer needs cost Rp. 4.954.643.081,75. The project enforcement can be done through several manufacture alternatives such as : the first alternative work starting from point A with heavy equipment to implement on one side to point B then proceed to the other side, the second alternative work starts from both point A and B with at point A to point B carry out the work on the right side and point B to point A on the left side, and the implementation of the contractor based on the situation and conditions in the field.
Keywords: cost analysis, productivity, heavy equipment, and enforcement method.
Tidak tersedia versi lain