Pekanbaru - Bangkinang Toll Road is part of the Trans Sumatra Toll Road based on Presidential Regulation Number 117 of 2015. Where based on information from the Service Provider and Service User experiencing delays in completion. The purpose of this case study is to identify and analyze the risk factors causing delays with a probabilistic approach and lean sigma method. The research method…
This study aims to analyze the condition and performance index of breakwater structures on Bengkalis Island based on the Guidelines of the Ministerial Circular Letter of the Ministry of Public Works No. 1/SE/M/2011, as well as to analyze the priority scale for handling the breakwater structures on Bengkalis Island. The research was conducted through direct field assessment. The physical co…
This study analyzes the comparison of infiltration areas in the Siak River Basin based on the Ministry of Public Works and Public Housing Regulation Number 10/PRT/M/2015 and the Ministry of Environment and Forestry Regulation Number 10 of 2022, utilizing Geographic Information Systems (GIS). The objectives are to identify the distribution and classification variations of water catchment areas a…
In embankment construction activities, the selection and use of materials are crucial aspects that must meet various technical requirements to ensure the quality and safety of the constructed embankment. One of the key parameters often used as a reference in determining the quality of soil embankment construction is the California Bearing Ratio (CBR) value. The objective of this study is to eva…
Premature damage to flexible pavements in Indonesia is generally caused by overloading, poor construction quality, and suboptimal design. One critical point of damage occurs in road widening projects, particularly at the interface between old and new structures, which is vulnerable to material fatigue and deformation due to repeated deflections. This study was conducted on the BTS Kampar Regenc…
SUMMARY MHD. RAJA ALFADH, NIM. 2210248026, Self-Healing Mortar Contained Nanosilica under Wet-Dry Conditions in NaCl Solution, Supervised and proctoring by Monita Olivia and Gunawan Wibisono In the marine environment, mortar as a construction material is susceptible to exposure to aggressive substances that can reduce its resistance and durability. This study aims to assess the characteristic…
The complexity in determining the priority scale for handling physical road reconstruction work at the Padang Lawas Regency Public Works Agency, Fiscal Year 2024 is a challenge so that it can be completed systematically using a measurable scientific methodology. The activities stated in the Padang Lawas Regency Public Works Agency work plan in the Highways Sector are 35 physical work packages. …