This research aims to determine the types of tides and current patterns in the north coast of Bengkalis Island. This research uses the Delft3D coastal hydrodynamic simulation model. The data used includes secondary data such as bathymetry data, tides and current speed at the research location. The calibration process is carried out using the Manning value and the reflection parameter alpha. Tid…
This research aims to identify the performance of the road network in existing conditions on the HR road section. Soebrantas, projected traffic performance in the short term (20238) and medium term (2032) against scenarios used for traffic engineering for DIC development, as well as comparing traffic handling scenarios in the short term (2028) and long term. middle (2032). This research uses pr…
Nowadays the construction of palm oil industry mills is advancing rapidly and the next one is Refined Palm Oil (RPO). RPO is one of the derivatives of palm oil processing. Oneoption to use structures in the construction of palm oil mills is to use concrete. Plant parts that have concrete components often suffer damage, cracks and reduced concrete strength. This study is intended to examine the…
This research aims to carry out a mapping analysis of flood points in the Tuah Madani District area using a Geographic Information System (GIS) with a focus on the 2023 rainy season. The increase in flood events is an important issue in the context of climate change and spatial planning. Mapping flood spots can provide information needed for disaster risk mitigation and infrastructure improveme…
Jalan Merpati Sakti is a local road that serves local transportation with the characteristics of short-distance travel, has a length of 1,400 meters and a width of 5 meters. Damage to the flexible pavement of Jalan Merpati Sakti, Pekanbaru City makes it uncomfortable for drivers to pass through the road. The author conducted direct observations on Jalan Merpati Sakti along 1,400 meters. The dam…
The purpose of writing this final project on Building Planning and Budget Plan (RAB) is to plan the building and calculate the Budget Plan for constructing a building. Data collection was carried out by conducting a literature study on manuals and documents related to building planning. In addition, data collection was also carried out directly in the field to collect data on the condition of l…
Pangkalan Kerinci City is a city with a high population growth rate. The increase in population causes the water catchment area to decrease, when the rainy season arrives with high rainfall causing rainwater to become surface flow, surface flow that exceeds drainage capacity will become puddle or flood. Flooding is a cycle that occurs naturally, floods must be managed and watched out for when i…
Sustainable transportation in cities can provide accessibility for all urban community groups at affordable prices for both the government and users of the existing transportation system. One example of sustainable transportation is the transfer of modes from private vehicles to public transportation. The increasing movement every day causes the performance of public transportation to be less t…
Public transportation is a transportation system provided by the government at an affordable price for all levels of society to meet the needs of the community. One of the tipes of public transportation that is widely available is the bus. The number of passengers that did not experience a significant increase post- pandemic indicates that many bus passengers still use privat…
Lightweight brick is an innovation and alternative material for walls that has a lower density compared to conventional red brick. However, lightweight bricks have several disadvantages, one of which is that they are weak against axial forces. Nowadays, the use of finite element programs such as LUSAS as a tool for analysis and design for structures is increasing rapidly in line with the develo…
The use of earthquake-resistant building structures is necessary in earthquake-prone areas such as Indonesia, especially for asymmetrical buildings. Structural resistance to earthquakes is seen based on the performance level of the structure. Analysis of structural performance levels needs to be carried out on buildings in earthquake-prone areas. The final project aims to analyze the performanc…
Liquefaction potential analysis is one of the challenges in the geotechnical field. Generally, liquefaction potential analysis is carried out using deterministic methods because the calculations are relatively simple and fast. However, the uncertainty of soil parameters and earthquake parameters means that analysis of liquefaction potential is more suitable to be carried out using probabilistic…
Pasar Simpang Baru is one of the traditional markets located on HR Soebrantas road in Pekanbaru city. Market activities such as people entering/exiting the market area and stopping vehicles can disrupt the speed of other drivers. Besides that, people's vehicles that park on the side of the road can reduce the road capacity. That side friction can affect road performance and vehicle operating co…
Most construction projects in Indonesia experience delays, indicating less than optimal project management. To increase effectiveness in project supervision and control, the Result Value Concept Method is used. This method connects time, cost and work progress to describe the ongoing project conditions. The research objectives calculate the cost and time performance index of project implementat…
Lightweight mortar is an alternative building material as a binder between bricks and plastering that has a lower density than brick in general. When a fire occurs in a building, it can affect the characteristics of the mortar which is characterized by discoloration and physical changes such as cracks on the surface of the mortar. Various innovations have been made to improve the quality of lig…
The economic improvement and population growth that occurs in Pekanbaru City can lead to an increase in people's welfare in owning motorized vehicles. The large number of motorized vehicles in Pekanbaru City can influence the level of traffic jams and accidents due to traffic density. Traffic density can cause problems such as traffic conflicts and even traffic accidents. Traffic accident cases…
The use of fly ash waste as an ingredient in the manufacture of concrete is a step taken to reduce adverse impacts on the environment. Fly ash can be used as a substitute for cement in concrete, commonly called geopolymer concrete. Geopolymer concrete must use high temperature curing in order to accelerate polymerization and increase its strength. The addition of cement to geopolymer concrete, …
The utilization of fly ash waste as a material in concrete production is a step taken to reduce the adverse environmental impact. Geopolymer concrete is one of the applications of fly ash as a substitute binding material for cement in concrete. However, geopolymer concrete requires high-temperature curing to accelerate the polymerization reaction and enhance its strength. Geopolymer hybrid conc…
Sisingamangaraja XII airport is located in Tapanuli Utara, North Sumatra. This airport serves as the main gateway for tourists visiting Lake Toba. The increasing number of tourists visiting Lake Toba has led to a rise in the number of passengers at Bandar Udara Sisingamangaraja XII. In 2018, the airport handled 428,536 passengers, exceeding the existing passenger terminal capacity of 281,266 pa…
The intersection area of Jalan Garuda Sakti and the intersection of Jalan Tengku Bey Pekanbaru, is a center for education, commerce, offices, airports and also access roads outside the city. Traffic volumes that are not balanced with capacity cause deadlock at each intersection, resulting in congestion. Congestion at intersections can be overcome with yellow box junction markings. Minister of T…