Critical Path Method (CPM) uses for investigate duration completion a project and search a possible acceleration of the current project. The aim of this research is for optimized cost on the structural integrity of the second floor on the project of Pembangunan Sarana dan Prasana Anjing Pelacak used CPM and determined critical path that on the network planning. Determine activities which has a …