ABSTRACT Before the construction of the MDA building of the Al-Muttaqin Mosque, the Budget Plan (RAB) is one of the main processes carried out to determine the total amount of work costs by outlining each work item starting calculating the volume of work, calculating Work Unit Price Analysis (AHSP), calculating detailed Budget Plans (RAB), all of which The calculation refers to the plan drawin…