The Critical Part Method (CPM) method is needed for analyzing the optimization of a project so that it can be known how long the project can be completed and find out if there is a delay. This research was conducted based on case studies on the construction work of Pekanbaru-Dumai Toll Road Section 2. In this study, the author discusses the optimization of the implementation of the Section 2 Pe…