CD Tugas Akhir
Evaluasi Kapasitas Pipa Microtunneling (Jacking) Pada Proyek Pembangunan Perpipaan Air Limbah Kota Pekanbaru Area Selatan (Sc-2)
ABSTRACT
Environmental pollution is one of the problems that are often encountered in areas
with high population density. One of the impacts of population density is the
increasing use of drinking water or clean water which has an impact on increasing
the liquid waste. With this problem, it encourages the formation of an integrated
wastewater treatment system. The purpose of this study is to calculate the existing
discharge and plan the pipe diameter for 2022 and 2038 according to the RTRW
Pekanbaru City. The data needed is a plan drawing, a master plan for the planning
area, the type of material and pipe diameter and data from the Central Statistics
Agency for the City of Pekanbaru in 2021. After conducting the analysis, the
results of the calculation of the largest existing discharge are 0.1161m3/s which
occurs in the Pipe MH 85 – MH 84 and Pipe MH 84 – MH 83, the pipe diameter
2022 is 600 mm and the pipe diameter 2038 is 600 mm. Thus, the planned pipe
diameter is more economical in terms of cost to be applied in the field and the
speed that has met the allowable speed standard is 0.3 – 3 m/s.
Keywords : Waste water management, Existing discharge, Pipe diameter.