CD Tugas Akhir
Estimasi Biaya Alat Berat Pada Pekerjaan Perbaikan Pada Jalan Parit Indah Kecamatan Bukit Raya
This research aims to calculate estimates of heavy equipment costs and productivity in Parit Indah road repair activities, Bukit Raya District. The heavy equipment studied in this final project are dump trucks, tandem rollers, tire rollers, asphalt finishers, and asphalt sprayers. The research methodology uses a data collection method through observation and surveys which is then matched with previously obtained data such as tool capacity, equipment unit price, and other data related to the tools used at the work site. The results of this research show that in the AC-WC layer work, 8 dump truck units were used with a productivity of 91,671 m³/hour, 1 tandem roller unit with a productivity of 103.68 m³/hour, 1 tire roller units with a productivity of 95,348 m³/hour, 1 asphalt unit finisher with a productivity of 52,488 m³/hour, 1 asphalt sprayer unit with a productivity of 5,953 m³/hour with equipment costs of Rp.484.465.756,00.
Keywords: Cost Estimation, Productivity, Number of Heavy Equipment, Parit Indah Road
Tidak tersedia versi lain