Perencanaan Dinas Pekerjaan Umum Dan Penataan Ruang Dalam Pencegahan Banjir Di Kota Pekanbaru Tahun 2019
The problem of flooding in Pekanbaru City is caused by river overflow
due to obstruction of the flow of the Siak River to the sea caused by tides, causing
an increase in the level of the Siak River. Meanwhile, those caused by rainfall are
due to accumulated garbage and the amount of sand sediment in the drainage /
drainage channel so that if there is rain the water flow will be hampered. Weather
factors and the effects of climate change that trigger an erratic rainy season cannot
be blamed but must be addressed by the government with adequate urban
planning. Pekanbaru City Government does not have a Master Plan for flood
prevention and water catchment areas for the long term. In addition, there are
urban planning which reduces the absorption of water to the ground, such as
semisizing sidewalks. The formulation of this research is "How is the planning
and what are the inhibiting factors of the Public Works and Spatial Planning
Service in Flood Prevention in Pekanbaru City in 2019?"
This study aims to analyze, identify and describe the planning and
inhibiting factors of the Pekanbaru City Public Works and Spatial Planning Office
in Flood Prevention in Pekanbaru City in 2019. This research is a descriptive type
of research using a qualitative approach. Data collection techniques in this study
using interview techniques, observation and documentation, data analysis used is
qualitative analysis.
The findings that can be concluded are the Planning of the Pekanbaru City
Public Works and Spatial Planning Agency in 2019 in Flood Prevention through 5
stages of the development planning process: 1.Planning, there are obstacles such
as not having a Flood Prevention Master Plan due to budget constraints so that the
resolution of the flood problem is not optimal. ; 2. Preparation of programs,
construction of sheet pile / talud / brojong, normalization of rivers and creeks, and
rehabilitation / maintenance of primary and secondary channels and bridges in
flood prevention in Pekanbaru City; 3. Implementation of plans, the obstacles are
not maximal implementation of programs and activities due to budget
rationalization and not maximal drainage maintenance officers in carrying out
their duties; 4. Supervision, supervises every program and activity carried out and
reports any irregularities that occur and takes corrective action; 5. Evaluation,
evaluating flood prevention development, one of the forms is a revidesign.
Keywords: Development Planning, Flood Prevention, Master Plan.