ABSTRACT
Environmental pollution is one of the problems that are often encountered in areas
with high population density. One of the impacts of population density is the
increasing use of drinking water or clean water which has an impact on increasing
the liquid waste. With this problem, it encourages the formation of an integrated
wastewater treatment system. The purpose of this study is to calculate the existing
discharge and plan the pipe diameter for 2021 and 2038 according to the
RTRWPekanbaru City. The data needed is a plan drawing, a master plan for the
planning area, the type of material and pipe diameter and data from the Central
Statistics Agency for the City of Pekanbaru in 2020. After conducting the
analysis, the results of the calculation of the largest existing discharge are 0.2671
m3/s which occurs in the Pipe MH 25 – MH26 and PipeMH 26 – MH 27, the pipe
diameter 2021 is 600 mm and the pipe diameter 2038 is 600 mm. Thus, the
planned pipe diameter is more economical in terms of cost to be applied in the
field and the speed that has met the allowable speed standard is 0.3 – 3 m/s.
Keywords : Waste water management, Existing discharge, Pipe diameter.