School is a place where students and teachers do the teaching and learning activities. As for the type and size of the school will also vary depending on the objectives of education passage and its resources. The purpose of this review was to determine whether the State Elementary Schools 001 Tambusai compliance with the regulations of Indonesia National Education Minister number 24 of 2007, an…
Healthy home is one requirement that have to fulfill, so that occupant can obtain an optimal health for supporting their daily activities. The purpose of the review is to determine whether home type 45 with the requirements of a healthy home by the Directorate of Housing Cipta Karya Department of Public Works in 1986 and to get the budget plan. The result of the review show that the application…
Pekanbaru City region is a region with a moderate level of earthquake in Indonesia Earthquake map SNI 03-1726-2002, so security is a major factor that needs to be reviewed for each plan. To that end, in addition to perform static analysis on the planning of the building, it is necessary Dynamic Analysis of the reaction caused by the forces working on the structure of the building, especially fo…
Penetration thermal post-combustion occurs in concrete can alter the chemical properties of concrete and of course, this directly affects the physical properties of the concrete is concrete performance in receiving compressive strength. This study was conducted with a sample in the form of a cube 15 cm x 15 cm x 15 cm with a W/C water factor variation Wateramong others are0:45, 0.5, and 0.6 0:5…
Pekanbaru city is considered as areas in category 3 of Indonesia Earthquake Map SNI 03-1726-2002. The condition required security as the main factor which need to review to any construction planning. This final task plan a reinforce concrete structure with regular configuration for 6-floor building which design referring to SNI 03-1726-2002. This study attempts to compare quake forces of the dy…
Viewed from the geographical location, Riau Province through many rivers. With the water flowing in it, the river continues its ground, the scouring of water along the river can lead to sliding. One of the landslide-resistant alternatives that can be used as riparian construction is sheet pile. The author plans a sheet pile as a riparian construction. The authors plan the construction of sheet…
Road damage can cause inconvenience for road users . Roads are damaged should be repaired or increased . Overlay calculations using data deflection on the way through the Kelakap Tujuh Dumai City conducted to complete the road infrastructure . The purpose of this study was to calculate the extra thick layer (overlay ) , the design life of 5 years and 10 years , traffic growth of 4,36% , while t…
Budi Kemuliaan street is one of the main access of the community from several region. This path is classified as a collector path with two undivide two-lane paths (2/2 UD). Visually visualizing the Road of Glory there is road damage such as patches, granular releases, perforations, and cracks that hamper the function of the service as a viable means of transportation to use. This final project …
Budi Kemuliaan street is one of the main access of the community from several region. This path is classified as a local path with two undivide two-lane paths (2/2 UD). Visually visualizing the Road of Glory there is road damage such as patches, granular releases, perforations, and cracks that hamper the function of the service as a viable means of transportation to use. This final project has …
Manpower or human resources is one of the most important factors of project success. In addition, another important factor is the planning of labor costs, because to know the amount of costs incurred. The purpose of this analysis 1) To know the distribution of manpower and cost. 2) Knowing in a certain week the accumulation of labor needs and the greatest costs and causes. 3) Knowing in a certa…
Time Schedule (work plan) is a detailed timeline is provided for each piece of work, starting from the beginning until the end of the work piece. Objective studies evaluating the work schedule and specify the path that occurs in network planning. Determining the work included in the critical path. Determining jobs are likely to be accelerated. Conclusions based on the evaluation of the time sch…
Viewed from the geographical location, Riau Province through many rivers. With the water flowing in it, the river continues its ground, the scouring of water along the river can lead to sliding. One of the landslide-resistant alternatives that can be used as riparian construction is sheet pile. The author plans a sheet pile as a riparian construction. The authors plan the construction of sheet…
Geometric Design of way is route design from certain a way as according to complete, include several element who suited with completeness data and having data base or available data from survey result at location and already for analysis along with refer to be valid standard. Processing data did using calculation be obtained. There is for Alinement Horizontal that a bend in the road mulberry da…
The problem of Parking Area in Faculty of Engineerig Riau University, is a phenomenon that deserves to be reviewed. The urgency of parking space needs to become a priority when the available land is not sufficient to accommodate the vehicles entering the parking area. In addition to the need to evaluate the need for parking lots, evaluations of safety levels, behaviors, and parking facilities a…
Street Garuda Sakti Is a ring road connecting Pekanbaru-Petapahan Road, This path is classifield as an artery road with two lanes of two directions (2/2TB). Viewing visually Garuda Sakti Road there is road damage such as surface cracks, bumpy, perforated. Loose aggreagate thereby inhibiting the function of service as a means of transportation that is suitable for use. This final project aims to…
Budget plan (RAB) It is very necessary in the process of building a house. RAB provides an overview of the costs incurred to build a house in accordance with the drawing of plans that have been made. The amount of RAB value is influenced by many things, such as the size of the building, the form of building construction, the material specifications used and also the location of development. To …
Time schedule is a detailed timeline is provided for each piece of work, raging from parts beginning to end warker. Part research purproses evaluate work schedule and determine the trajectories that occur in network planning. Determine the work that has the possibility, to accelerate the evaluation of the time schedule by using network diagram obtained by the number of passes as much as 12 that…
The problem of Parking Area in Faculty of Teacher Training and Education (FKIP) Campus Bina Widya, University of Riau, is a phenomenon that deserves to be reviewed. The urgency of parking space needs to become a priority when the available land is not sufficient to accommodate the vehicles entering the parking area. In addition to the need to evaluate the need for parking lots, evaluations of s…
Traffic accidents are one of the biggest causes of death in Indonesia. The large number of victims will have significant economic and material (social and material damage) impacts, prefentive efforts to improve traffic by involving various related parties, the results are not as expected. Factors that cause accidents are human factors, vehicle factors, road factors and environmental factors. Hi…
Fibre is one of alternative material for increase quality of concrete. The purpose of this research is to compare compressive strength of concrete without fibre and fibre concrete. The percentage of fibre bamboos skin on this research is 0,1%, 0,3%, 0,5%, 0,7%, and 0,9% by weight volume aggregate. Methods of mixing fibers into the concrete mix in a random way after the concrete is mixed evenly.…