ABSTRACT The mosque is derived from the word sajada which means a place of prostration. Mosques are an integral part and also play a very important role for Muslims around the world. Not only used for places of worship, but the mosque is also the center of muslim community life, discussions, religious studies, lectures and learning the Qur'an is often carried out in mosques. While the Cost Bu…
ABSTRACT Dharma Bakti street is a collector road connecting centers of activities such as education, offices, health, commerse and housing. This path is classified as a collector path with two lane road with undivided of two way (2/2 UD). The damage level evaluation of road is necessary for monitoring the level of destruction that occurs on a road. The result obtained will be helpful in th…
ABSTRAK Jalan HR Soebrantas KM 15 is a 4-lane, 2-way road divided (4/2 T) with a lane width of 3.8 m, the performance of Jalan HR Soebrantas KM 15 has decreased due to population growth, the number of motorized vehicles and activities on the right and left of the road, so that the value the ratio between traffic volume and road capacity becomes high which can result in congestion. To prove…
ABSTRACT Dr. Street Soetomo is an undivided 2-lane 1-way collector road (2/1 UD) with a road width of 8.9 m which is located in Rintis Village, Lima Puluh District, Pekanbaru City. Soetomo is decreasing due to population growth, the number of motorized vehicles and activities on the right and left of the road, so that the ratio between traffic volume and road capacity becomes high which ca…
ABSTRACT Structure efficiency includes structural design objectives that are relatively more economical. The efficiency of a structure is considered high if the ratio of the strength of the structure to the weight of the structure is also high. Efficiency is needed as a planning guide so that the planning process can produce effective and efficient results. In this report the authors make …
ABSTRAK The engine test bed is a laborious device that passes fuel to the vassel measure, and then from the fuel gauge is piped to the carburetor before entering the engine room. Fuel consumed time is calculated by a stopwatch, while air goes into the carburetor after passing the orifice plate that can be seen on diferential manometer. Loading on the engine is done by the tromol by pressin…
ABSTRACK This study aims to draw plans and calculate the Budget Plan (RAB) for a 2-storey house type 450 m2 Couple House. This study uses literature methods, field observations and interviews for data collection. The final results of the study obtained a 2-storey Couple house plan with an area of 450 m2 with a Budget Plan (RAB) having a price of IDR 1,723,921,000.00 (One Billion Seven Hund…
ABSTRACT Pekanbaru as the capital of Riau Province with a population of 954,373 people (BPS, 2020). It is projected that this number will continue to increase every year by around 3-4% as a logical consequence of increasing consumption of clean water needs in Pekanbaru City. The Regional Drinking Water Company (PDAM) Tirta Siak Pekanbaru City is one of the companies engaged in the public …
ABSTRACT The cause of project delays in terms of planning and scheduling is the management aspect. To avoid project delays, Yayasan Pondok Modern Al Kautsar development project was delayed due to lack of manpower, changes in work items, and difficulty getting into the project so that one alternative was needed, namely analysis of Network Planning with Critical Path Method (CPM), Project Ev…
Finite element method is an object modeling method to divide it into smaller parts because the whole still has the same properties as the whole before it is divided into smaller parts (discretization). The purpose of this research is to make a 3D modeling of the butterfly bridge which is then analyzed based on the angle of the bridge pile and the ratio of the height of the bridge profile to obt…
Traffic management is one of the traffic management strategies that make maximum use of existing transportation infrastructure and facilities. The Central Business District (CBD) or the City Center Area (DPK) is the center of all city activities and a strategic location for city scale trading activities. One of the traffic constraints in Pekanbaru City, especially the activity center area of Ja…
Purpose of this study was to determine rate of potential demand of school transportation to be operated in the education area in Pekanbaru City and define service routs, types and quantities of transportation. The scope of this study is several junior and senior high school located in Lima Puluh District e.g. SMP 5, SMP 1, SMP 14, SMA Handayani, SMP 4, SMP 10, SMP 9 and SMK 1. This study using …
ABSTRACT Dumai City is an area located in the eastern part of the mainland of Sumatra which is located close to the Malacca Strait as a world shipping lane so as to result in the rapid development of industrial, commercial, agricultural and shipping activities. the development of the progress of these activities directly causes a decrease in the quality of coastal waters, due to the increa…
ABSTRACT Concrete geopolymer FABA hybrid is made from a mixture of aggregates, FABA containing alumina and silica as a binder from the polymerization reaction with an activator alkaline solution and Portland Composite Cement as an additive. This study examines the effect of several variables on FABA hybrid geopolymer concrete, such as NaOH molarity, Ms ratio, PCC addition percentage, alka…
vi Effect of Earthquake Recording Characteristics on Spectrum Respon (Case Study : Fly Over Jl. Tuanku Tambusai – Jl. Soekarno Hatta Pekanbaru) Asril Nikson Civil Engineering Study Program S1 Faculty of Engineering The University of Riau
Site class F is a profile of soil layers that are prone to failure or collapse due to earthquake loads such as liquefaction, highly sensitive clays, weak cemented soils, and highly organic clays that require specific geotechnical investigations and site-specific response analysis. If a structure has a shape or configuration not profitable to influence of earthquake forces, then the structur…
Tapung Kiri Sub river Basin is part of siak river basin which is categorized as a critical basin river and a flood prone area. The potential for flooding is caused by high rainfall in the middle, upstream and along basin river that have undergone land use changes. So it is necessary to do debit forecasting to find out when floods will occur in the future. There have been many hydrological mode…
Peatland fires are a recurring phenomenon and become a biggest problem in Indonesia. This problem was triggered because of conversion of peat swamp forest into agriculture and plantations, accompanied with the construction of drainage canals. The land use change with canalization can affect the hydrological function of the peat ecosystem which causes over drain and drought. One of the efforts t…
Pekanbaru City, which is the regional center of Riau, has three main functions, namely the center of government activities, the center of trade activities and the center of transportation activities. This research aims to analyze the level of intersection services based on the intersection traffic data, whether the degree of saturation has passed the DS = 0 threshold. , 75. If the DS value is> …
Increased air traffic at Sultan Thaha Syaifuddin Airport (Sultan Thaha Airport) located in Jambi City, Jambi Province and managed by PT. Angkasa Pura II occurs every year. PT. Angkasa Pura II plans to increase the ability of Sultan Thaha Airport to be able to serve wide-body aircraft by increasing the length and width of the runway with the current size of 2.220 meters long and 30 meters w…