Before the construction of a building, the Budget Plan is one of the main
processes involved for setting the total amout of work costs with deciphering each
job item begins to calculate the work volume, making Work Unit Price Analysis,
making details of the cost Budget Plan, which all of these calculations refer to the
drawing plan.In this final assignment report, author designed the drawing plan
with a building area of 352 m2 and making work plans and technical requirements
of the structural work specifications. As for the total cost of the building that is
Rp1.823.046.000 and for the cost per m2 of the building is Rp5.179.107,95.
Keywords: The Budget Plan, Private Villa