ABSTRACT Concrete is a very important and most dominant construction material used in structural components. These structural components make for the use high strength concrete which includes strength, durability, service life and efficiency. This study aims to determine how much influence MasterSure® 1007 chemicals have on the mechanical behavior of concrete, how they affect the workabil…
ABSTRACT Concrete is defined as a mixture of cement, fine aggregate, coarse aggregate, and water with or without using additional materials. The usage of additional admixture such as superplasticizer is expected to obtain a premium concrete. This research objectives to acknowledge how much compressive strength influence the concrete if added with MasterGlenium ACE® 8595. MasterGlenium AC…
ABSTRACT Concrete is defined as a mixture of Portland cement or other hydraulic cement, fine aggregate, coarse aggregate, and water, with or without admixture. Various types of concrete technology have now been developed according to their needs, one of which is high-strength concrete. The use of admixture additives such as superplasticizer is intended to facilitate the concrete mix (worka…
ABSTRACT Time Schedule is a detailed division of work duration on each project work. The problem in this study is the ineffectiveness of the duration of the work and the amount of work done is not in accordance with the planned duration. The purpose of the study was to evaluate the time schedule using the network planning method to determine the critical trajectory by using Microsoft Proje…
ABSTRACT The Final Task Writing on Building Planning and Cost Budget Plan (RAB) aims to plan a building and calculate the Cost Budget Plan for building a building. Data collection is done by conducting literature studies on manuals and documents related to building planning. In addition, data collection is also carried out directly to take data on the condition of land, land and water leve…
ABSTRACT Palm oil trunk (palm wood) is a solid waste with considerable potential and has not been optimally utilized. Optimizing the utilization of palm oil stem waste can be used as a substitute for the use of wood species which are increasingly expensive and have diminishing potential. However, oil palm wood has a lower wood quality compared to commercial wood or coconut wood. This reaso…
ABSTRACT Cipta Karya Reservoir located in the Cipta Karya area is a reservoir that functions to accommodate the flow of water in the Panam area. Cipta Karya Reservoir has outlet and inlet doors made of iron doors. But because the door is made of iron, the door is corroded causing the reservoir to not hold water optimally. This final project aims to change the door that was originally iron …
ABSTRACK Before the construction of a building, the Budget Plan is one of the main processes involved for setting the total amout of work costs with deciphering each job item begins to calculate the work volume, making Work Unit Price Analysis, making details of the cost Budget Plan, which all of these calculations refer to the drawing plan.In this final assignment report, author designed …
ABSTRACT Testing the flexural strength and compressive strength of wood is a test based on the mechanical properties of wood, namely resisting tension and pressure. In this test, three different variations were carried out for each flexural and compressive strength test, namely, flexural strength of solid wood, flexural strength of wood coated with 1 layer of resin and flexural strength of…
ABSTRACT Strong testing flexures are testing based on wood mechanical properties, namely holding the pull. The testing is done by three different variations on every strong testing of flexible, strong flexible acacia, strong flexible wood coating with resin 1 layer, strong flexible wood coating with resin + fiberglass fabric 1 layer and strong flexible wood coating with resin + fiberglass …
ABSTRACT Hangtuah Street is a 2-lane collectors 2-way road undivided (2/2 UD). This road is be passed by various types of vehicles from light vehicles (LV), heavy vehicles (HV), and motorcycles (MC). The intensiveness of population is not balanced with growth of Pekanbaru City infrastructure, it causes traffic jams at rush hour. This Final Project aims to calculate the performance on Hangt…
ABSTRACT Jalan Arifin Ahmad is a four-lane, two-way divided road (4/2 T) with a length of 4,25 km and a width of 15 m, located in Pekanbaru City. On this road, it is a trade center and office center so that it causes a pull for the public to come to Jalan Arifin Ahmad and is prone to traffic problems which will affect the performance of Jalan Arifin Ahmad. This road is traversed by various…
ABSTRACT HR. Soebrantas Street is a primary collector road 4 lanes 2 direction are divided (4/2 D). This road is traversed by various types of vehicles from light vehicles, heavy vehicles, large buses, large trucks and motorbikes. The imbalance of land transportation facilities with an increase in the number of vehicles accompanied by roadside activities causes traffic congestion during ru…
ABSTRACT Budget Plan on an infrastructure development is a calculation of the amount of costs required for materials, equipment and wages, as well as other costs associated with project implementation. The cost budget is the price of materials or materials, tools and wages that are calculated carefully and carefully. The budget for the same project will differ in each region, due to differ…
ABSTRACK Before the construction of a building, the Budget Plan is one of the main processes involved for setting the total amount of work costs with deciphering each job item begins to calculate the work volume, making Work Unit Price Analysis, making details of the cost Budget Plan, which all of these calculations refer to the drawing plan. In this final assignment report, author designe…
Changes in land use can provide benefits, but can also be bad for the environment, such as combustion and logging of vegetation / forests on peatlands, this causes water on peatlands to decrease overly causing peatlands to dry and flammable. This study aims to determine the condition of the balance of water based on land use data in 2010 and 2019 and the influence of land use changes to th…
The Koto Panjang hydropower dam is a dam located in the Kampar Watershed (DAS) which originates in West Sumatra and downstream in Riau. Kampar watershed is a place for various human activities such as fisheries, tourism, agriculture, settlements and so on. Changes in land use cause rainwater that should enter the ground to turn into surface runoff. The number of human activities carried out in …
Abrasion and sedimentation are events that usually arise due to the movement and accumulation of material carried by ocean currents. Severe damage occurred in coastal areas such as on Bengkalis Island. Research on the initial motion of grains, especially on peat material, is very interesting to study. This study aims to analyze the relationship between flow velocity and grain diameter at the be…
This study aims to analyze the financial feasibility of investing in the Pekanbaru-Dumai toll road infrastructure project through a stochastic (probability) approach. This study uses random data with financial variables in the form of data on national economic indicators (Bank Indonesia Certificate, Riau Province Inflation, Jakarta Inter Bank Offer Rate) and investment costs for the Pekanb…
Daya dukung tanah dapat didefinisikan sebagai kemampuan tanah untuk menopang beban pada pondasi struktur di atasnya. Dalam menentukan daya dukung pondasi, data penyelidikan tanah yang umum digunakan adalah berdasarkan Cone Penetrometer Test (CPT) atau Sondir Test yang berupa nilai tahanan ujung (qc) dan tahanan gesekan (qs). Tujuan dari penelitian ini adalah mendapatkan peta yang menggambarkan …