Central Gathering Station (CGS - 1), a facility to process fluid that is pumped from the production wells in duri city. Fluid flowing into the CGS - 1 will be separated into water, oil and solids, then the fluid is heated using a heat exchanger so that the separation between oil and water is better, but the heat is not enough for separation because of the persistence of the emulsion. For that u…