The drainage problem in Aursati Village, specifically in Hamlet 4, is currently facing quite a serious problem. Inundations and flooding often occur at several points during the rainy season due to the small dimensions and disconnected drainage channels. The aim of this research is to evaluate channel capacity and analyze alternative drainage management methods. Evaluation of drainage channel c…