The Sumatra 500 kV Transmission Project is the main project supporting the transmission line below and first on the island of Sumatra. The Project Performance of Sumatera 500 kV Transmission is located Riau with a path length of ±160 kms and a total of 379 tower foundation points but in its implementation the project experienced a time delay. The absence of similar research especially in the d…