Based on the S curve on the time schedule for the construction of the D.I Primary Irrigation Network for the Sawah Laweh Tarusan Area in Kab. Pesisir Selatan - West Sumatra can be seen from the plan curve and the realization curve, which shows that the work was completed on time, but the realization curve is below the plan curve, which usually indicates that the work is late. Under these condit…