The construction of the Integrated Domestic Waste Treatment System (SPALD-T) is expected to be completed by December 2020, but the construction of the project is not in accordance with the stipulated timeframe. This study aims to determine the policy implementation of what factors caused the implementation of the policy for the development of a Centralized Domestic Wastewater Management Sy…