The activity of monitoring the discharge and the water level in the Koto Panjang hydropower reservoir is generally still done conventionally, namely the reading of a sign or water boundary installed in the reservoir by way of back returning from the power house to the reservoir which on average is done three times a day, It is necessary to monitor the discharge and water level in the Koto Panja…