ABSTRACT Time Schedule is a detailed division of work duration on each project work. The problem in this study is the ineffectiveness of the duration of the work and the amount of work done is not in accordance with the planned duration. The purpose of the study was to evaluate the time schedule using the network planning method to determine the critical trajectory by using Microsoft Proje…