ABSTRACT This final project discusses how to determine the point of reordering on the EOQ model where there are defective goods. Inspection is carried out to distinguish defective goods from good goods. How to determine the reorder point, which is the average demand multiplied by a known and constant waiting time. Making an order before the inspection time is over, an order is made before …