The objectives of this research are to analyze the energy and exergy of the 4x6 MW Gas Power Plant which has been operated by BOB PT. Bumi Siak Pusako - Pertamina Hulu for 10 years to run production operations in two main fields, namely Zamrud and Pedada which require high energy consumption. The decline in oil production and the large operating costs at CPP Block BOB PT. Bumi Siak Pusako …