ABSTRACT In general, the compressive strength of concrete is influenced by the composition of the concrete, but it turns out that it is not only influenced by the composition of the concrete, but also by the speed of loading. The effect of variations in axial loading speed on concrete compressive strength value fc' 20.75 MPa will be tested in this study. This test aims to determine the effect …
ABSTRACT Minimum service standards for toll roads consist of several service substances, namely toll road conditions, average travel speed, accessibility, mobility, safety, aid/rescue units and service assistance, environment, and rest areas. Accessibility is a service measure that must be achieved related to the ease of interaction between toll users and facilities on toll roads, namely t…
ABSTRACT The author is interested in planning the thickness of rigid pavement on the road for the sake of safety and travel comfort for the surrounding community. in this study, namely how thick rigid pavement is needed on Jalan Beringin, Payung Sekaki Tapung District, Kampar Regency which meets the standards of the 2017 Road Pavement Design Manual. directly in the field for 3 days, namely Wedn…
ABSTRACT Merbau tree sawdust ash is a waste generated from the burning process of sawdust from furniture craftsmen. Sawdust ash has the potential to be developed as a partial substitute for cement in the manufacture of mortar. This study aims to determine the effect of adding wood ash to the compressive strength of mortar. Before making the specimens, the properties were tested on fine aggrega…
ABSTRACT The intersection of Jalan Riau - Jalan Kayu Manis is a three-arm unsignalized intersection in Pekanbaru City and often experiences traffic jams. The purpose of this study was to evaluate the performance of the unsignalized intersection of Riau Street - Kayu Manis Street. The method for calculating the performance of this unsignalized intersection is guided by the MKJI 1997. Based …
ABSTRACT Before the construction of the MDA building of the Al-Muttaqin Mosque, the Budget Plan (RAB) is one of the main processes carried out to determine the total amount of work costs by outlining each work item starting calculating the volume of work, calculating Work Unit Price Analysis (AHSP), calculating detailed Budget Plans (RAB), all of which The calculation refers to the plan drawin…
ABSTRACT The Rokan Kiri sub-watershed station AWLR (Automatic Water Level Recorder) of Lubuk Bendahara has experienced the development of land use from forests to plantations, agriculture and settlements. Changes in land use can result in floods and cause water availability to decrease every year. The decrease in water availability is due to the ability of the sub-watershed to respond to falli…
ABSTRACT Bengkalis Island has a very large area of peat, 66,429.92 hectares of peatland that has been damaged. With the large area of peatland that has been disturbed and the massive construction of drainage canals in the peat ecosystem, it has an impact on the drainage of peatlands, decreasing water storage capacity. Research at the Peat Hydrological Unit (KHG) of Bengkalis Island needs to be…
ABSTRACT In the era of this pandemic, Covid-19 has hit the world and Indonesia is included in it. Indonesia is fighting against Covid-19 by adjusting policies, regional quarantine into a large social event (PSBB) that is local in severity in the province, district or city. During a pandemic in the world economy and Indonesia has experienced this, the government has scheduled a New Normal policy…
ABSTRACT The process of implementation on contruction work of MAN 4 pekanaru’s dormitory bulding run into tardiness which is caused by the addendum of addition and reduction of work causing the lack of weekly job load in result. This project started on september 12th 2020 on 96 calendar days. to avoid tardiness on this work project, addition of working days and overtime hours have been added…
ABSTRACT According to Mahardika (in M.Kautsar Nur Rochman, 2017) Road Transport Traffic Safety Facilities (KLLAJ) are all parts of the road and there are several criteria as considerations to optimize the safety of road users including traffic signs, road markings, traffic signaling devices. traffic, street lighting devices, controllers and road user safety devices. The purpose of installi…
ABSTRACT The use of mortar in Indonesia in construction is quite high, such as wall plastering, composite column fillers and so on, but the quality of the mortar itself is not considered. The purpose of this study is to produce an alternative waste-based mortar with a stronger quality than normal mortar, and to determine the effect of adding palm shell fly ash and dolomite lime to the resultin…
ABSTRACT Railways street is an undivided 2-lane 2-way collector road (2/2 UD) with a road width of 6.9 m which is located in Wonorejo Village, Marpoyan Damai District, Pekanbaru City. Railways is decreasing due to population growth, the number of motorized vehicles and activities on the right and left of the road, so that the ratio between traffic volume and road capacity becomes high which ca…
ABSTRACT Before the construction of a building, the real estimate of cost is one the main processes carried out to determine the total amount of work costs by describing each work item. In writing this final project, the author wants to tell you how to plan and calculate of the real estimate of cost for a two-story lodging with an area of 240 M². Then make details of the real estimate of cost…
Peatland fires are an actual problem in Indonesia especially in the PHU (Peat Hidrology Unit) area on the islands of Sumatra and Kalimantan always have the same problem in recent years. The water balance analysis and peatland fires in this study were carried out spatially and temporally. The spatial analysis in this study is an analysis related to the distribution of hotspots using Landsat …
ABSTRACT Pemuda’s Road in Pekanbaru city is a collector road that connects the activity centers of Pekanbaru that has length about 2.235 meters and width about 6 meters. The purpose of this research were to determine the types of the damage, and find the index value of the flexible pavement condition on Pemuda’s road by using the Pavement Condition Index (PCI) method. This research was…
ABSTRACT The construction of high-rise buildings starting from the design stage to the implementation stage requires time and careful planning, especially in terms of structural planning. In designing high-rise buildings, the role of column structures is very vital to the strength of a building structure. The purpose of this study was to determine the safety of the dimensions of the columns in…
ABSTRACT SM. Amin Street is one of the highways located in the District of Tampan. Pekanbaru City, Riau Province. Soekarno-Hatta road is a provincial road (primary collector) with type 6 lanes 2 divided directions. As one of the road that accesses downtown Pekanbaru, SM. Amin road is one of the road that deserves attention for the convenience of motorists. Road performance is the ability of a …
ABSTRACT Riau University has poor drainage channels, especially in the area of the Faculty of Economics and Business, where the channel does not work optimally because the channel has quite a lot of sedimentation, as a result of which the drainage channel does not work optimally and there is a lot of inundation around the review area. The purpose of this study is to determine the level of cond…
ABSTRACT The construction of toll roads has various types of large-scale works which usually require quick resolution of problems, for this reason it is necessary to consider using heavy equipment that is adapted to work conditions. Heavy equipment is an important factor in the implementation of construction projects. The purpose of using heavy equipment is to make it easier for humans to carr…