ABSTRACT The Final Task Writing on Building Planning and Cost Budget Plan (RAB) aims to plan a building and calculate the Cost Budget Plan for building a building. Data collection is done by conducting literature studies on manuals and documents related to building planning. In addition, data collection is also carried out directly to take data on the condition of land, land and water leve…