ABSTRAK In the implementation of excavation work on the Revitalization of Lake Bakuok project in Kampar Regency, heavy equipment assistance is needed to facilitate the work process, one of which is in excavation and soil transportation. The gradual or relay excavation method causes problems such as high equipment efficiency and fuel consumption so that operational costs increase and the du…