ABSTRACT In the construction of the Trans-Sumatra Toll Road, Rengat–Pekanbaru Section, specifically at the Pekanbaru Ring Road segment Sta. 193, two identical bridges are planned to employ prestressed concrete box girder structures. The construction of these bridges adopts the balanced cantilever method. Implementation of the balanced cantilever technique requires optimization through cr…