CD Skripsi
Manajemen Pendaratan Ikan Pelabuhan Perikanan Nusantara Palabuhanratu Kabupaten Sukabumi Provinsi Jawa Barat
This research was conducted in March until April 2017 at Fishery Port of Nusantara Palabuhanratu West Java Province. The purpose of this research is to know the cause of difference of fish landing implementation in PPN Palabuhanratu with guidance of fishery landing fishery management of Directorate of Infrastructure. The method used in this research is survey method, that is by observing the elements - elements and management functions associated with fish landing facilities and activities in the VAT Palabuhanratu. From the results of the research indicate that there are differences in the implementation of fish landing activity in the VAT Palabuhanratu with guidance of fish landing method Directorate of Infrastructure Development. First, the ships that will be docked will be given the queue number and the officer determines the demolition site, but the ship is closing its vessel on the dock unloading without the supervision of the port officer. Secondly, the ship landed the fish at the front loading pier of TPI and when it was completed the demolition of the vessel was supposed to be transferred to the boat mooring dock, but that happened finished unloading the catch, the ship was not directly transferred to the parking lot of the ship, but parked his ship on the dock Unloading it. So the other vessels do the demolition at the mooring dock.
Keywords: Fish Landing, Management, Palabuhanratu
Tidak tersedia versi lain