ABSTRACT The reliability of the radial feeder KP02–PK Kampung Aie remains low, as indicated by the high frequency of power outages experienced by customers under existing conditions. This study evaluates network maneuvering by utilizing alternative power supplies from PLTD Sibigo and KP03–PK Alafan as parallel paths to limit the affected area and outage duration. Two main approaches are em…