ABSTRACT The CWR-01 AKSI ADB UNRI Physical Construction Project, specifically the Health Studies Complex Lecture Building, recorded a progress of 70,381% by the end of October 2023. However, according to the initial plan, the project should have reached 100%, resulting in a deviation of 29,618%. Therefore, it is necessary to identify the risks associated with the delay. This study aims to iden…