This research was conducted on October 2016 in the village of Jaring Smooth, Secanggang, Langkat, North Sumatra Province, aimed to find out type and size / capacity fishing ports facilities need. used a survey method. The result of the research indicated that the length of loading docks required is 40.43 meters, 3.61 meter length unloading dock. Extensive pool is needed 9643.3 meter2 port, …